PermitFinch turns public building permit data into a weekly list of new residential pools. This page explains where the data comes from, how we decide what counts as a new pool, how often it updates, what we leave out and how we handle privacy.
Where the data comes from
Every record starts in a government dataset. City and county building departments publish permits on open-data portals, often built on platforms such as Socrata or ArcGIS. The City of Austin's Issued Construction Permits dataset is one example. It covers building, electrical, mechanical and plumbing permits, with fields such as issue date, location, description of work and valuation.
Each source belongs to one metro. Our data sources page lists every feed with a link to the dataset, its license, the latest permit date we hold and whether the feed is healthy.
PermitFinch covers 32 metros and holds 17,618 new residential pool permits issued in the past 365 days. History goes back to January 2024 where the source provides it.
How we find new residential pools
Pool permits are a small share of all permits, and every city labels them its own way. For each source we:
- Read the permit type and description. We keep permits whose type or description shows new construction of a pool or spa at a home.
- Classify the pool. When the text makes it clear, we tag each permit as a pool, a pool with spa, a prefabricated pool or a standalone spa.
- Normalize the fields. We clean addresses, standardize city names and five-digit ZIP codes, and tidy builder names so one company counts as one builder.
- Remove duplicates. Each permit gets one ID built from the source and the city's permit number, so reading a feed twice never counts a pool twice.
What we exclude
- Repairs, resurfacing, replastering and remodels of existing pools
- Equipment-only work, such as a new heater, pump or electrical service
- Demolitions and pool fill-ins
- Commercial, public and shared community pools
- Fence-only and barrier-only permits
- Separate trade permits that repeat a main pool permit
A permit that removes an old pool and builds a new one in its place counts as a new pool, so rebuilds appear in the list.
Builder names
Builder names are business names, and they appear on our public pages. When the contractor field shows an owner acting as their own builder, or a placeholder such as "Owner," "Self," "N/A" or "Not listed," we leave the builder blank.
How often the data updates
- Daily checks. We query every source each day.
- Late records. Each check re-reads about the past three weeks, because cities add and correct records after the issue date.
- Monday list. Subscribers get one email each Monday with the permits we first found during the past week, attached as a CSV.
- Source health. If a feed fails several checks in a row, we mark it Delayed on the data sources page and work to restore it. The page also shows the latest permit date we hold for each source.
How we build the public statistics
Every metro page is built from the same cleaned permit records, counted by issue date:
| Statistic | What it shows |
|---|---|
| Monthly counts | New pool permits per month for up to 24 full months, plus the current month so far |
| Weekly counts | The last 12 weeks, to show recent pace |
| Last 30, 90 and 365 days | Rolling totals, with the prior 365 days for comparison when we have the history |
| ZIP and city tables | Permits by ZIP and by city, sorted by the past 365 days |
| Top builders | Up to 25 builders ranked by permits in the past 365 days, with each builder's share of permits that name a builder |
| Pool types | The mix of pools, pools with spas, prefabricated pools and spas |
| Seasonality | Average permits for each calendar month, to show the busy and slow seasons |
| Median valuation | The middle reported job value over the past 365 days, where sources publish valuation |
The data sources page shows the latest issue date for each source, so you can see how fresh the numbers are. Counts can shift slightly from week to week as cities add late permits or correct old ones.
Why counts may differ from a city's own reports
Our numbers count only new residential pools and spas. A city report on "pool permits" may include repairs, commercial pools or trade permits. Cities also count by different dates, such as application date or final date, while we count by issue date.
Coverage limits
Permit data is the best early signal of a new pool, and it is still incomplete.
- We cover only jurisdictions that publish permit data online. Each metro page lists the cities and counties included.
- Labels vary. A pool filed under a generic category can slip past our filters.
- Rules for above-ground pools and portable spas vary, and some never need a permit.
- Unpermitted pools do not appear in any government feed.
- Some cities post permits late or change records afterward.
Our guide to what a pool permit tells you covers these limits in more detail.
Our privacy approach
Permit records are public, and we still limit what we publish.
Public pages show aggregates only. You will see permit counts by month, week, ZIP, city, builder and pool type. Public pages never show a street address, owner name, permit number, parcel ID or a link to an individual permit.
Thresholds protect small areas. A ZIP code gets its own page only when it has at least 10 permits in the past 365 days. A builder gets its own page only with at least 5.
The sample is masked. Our sample list hides house numbers (for example, "39xx Wexbury Ct"), drops owner names and permit numbers, uses only permits issued at least 14 days earlier and shows no more than 10 rows.
Subscribers get full rows. Paying subscribers receive the address, city, ZIP, builder, description, permit number, issue date, coordinates, the owner name when the source publishes it and a link to the government record.
We expect responsible use. We ask subscribers to follow mail, phone and email laws, including the CAN-SPAM Act and the National Do Not Call Registry rules, and to honor every opt-out. See our terms and privacy policy.
Questions about a record or a source? Contact us.
See the data for your metro
The weekly list costs $79 a month per metro. See how it works or pick a metro:
- Phoenix, AZ 1,588 permits in the last 12 months
- Tucson, AZ 70 permits in the last 12 months
- Los Angeles, CA 1,438 permits in the last 12 months
- Orange County, CA 38 permits in the last 12 months
- Riverside, CA 66 permits in the last 12 months
- Sacramento, CA 188 permits in the last 12 months
- San Diego, CA 526 permits in the last 12 months
- Bradenton, FL 1,869 permits in the last 12 months
- Cape Coral, FL 1,260 permits in the last 12 months
- Daytona Beach, FL 80 permits in the last 12 months
- Gainesville, FL 88 permits in the last 12 months
- Miami, FL 1,373 permits in the last 12 months
- Ocala, FL 558 permits in the last 12 months
- Orlando, FL 828 permits in the last 12 months
- Port St. Lucie, FL 718 permits in the last 12 months
- Tallahassee, FL 42 permits in the last 12 months
- Tampa, FL 950 permits in the last 12 months
- Atlanta, GA 98 permits in the last 12 months
- Baton Rouge, LA 86 permits in the last 12 months
- New Orleans, LA 177 permits in the last 12 months
- Las Vegas, NV 506 permits in the last 12 months
- Albuquerque, NM 54 permits in the last 12 months
- Charlotte, NC 798 permits in the last 12 months
- Raleigh, NC 454 permits in the last 12 months
- Wilmington, NC 314 permits in the last 12 months
- Memphis, TN 132 permits in the last 12 months
- Nashville, TN 326 permits in the last 12 months
- Austin, TX 780 permits in the last 12 months
- College Station, TX 64 permits in the last 12 months
- Dallas-Fort Worth, TX 1,713 permits in the last 12 months
- Midland, TX 68 permits in the last 12 months
- San Antonio, TX 368 permits in the last 12 months